PROJECT GROUP: Saaremaa
PROJECT GROUP: JSC “Western hulls constructions”
Client: JSC “Western hulls constructions”
Country: Lithuania
Year: 2012 – 2013
Project: Ship Boston, tanker
Client: JSC “Western hulls constructions”
Country: Lithuania
Year: 2009 – 2010
Project: Production of metal reels (various size)
PROJECT GROUP: Welding and metal constructions assembly
Project work: Welding and metal constructions assembly
Country: Lithuania
Year: 2008 – 2009
Project: Car Ferry 66
Project work: Welding and metal constructions assembly
Country: Lithuania
Year: 2010
Project: Car Ferry 67
Project work: Welding and metal constructions assembly
Country: Lithuania
Year: 2009
Project: Car Ferry 68
Project work: Welding and metal constructions assembly
Country: Lithuania
Year: 2010
Project: FV BLRT 08-70
Project work: Welding and metal constructions assembly
Country: Lithuania
Year: 2010 - 2011
Project: FV BLRT 09-71
Project work: Welding and metal constructions assembly
Country: Lithuania
Year: 2011
Project: FV BLRT 08-70
OTHER PROJECTS |
|
|
||
Client |
Country |
Project |
||
JSC “Western Ship repair”
(a daughter-company of the Western Shipyard) |
Lithuania
2014 |
Silver Fjord project, Ref. cargo ship | ||
Technip Offshore | 2013 | SPAR platform | ||
Aileron Oy | Finland
2013 – present |
Ships building | ||
GE project, Technip, NOV, AKSO, SWENSSON 2015, 2016, 2017 | ||||
Hull assembling, mechanical, electrical, insulation, pipeline, cladding, trim and Outfitting works. | Lithuania
201? |
Building of two oil tankers (DW-3100 tn).
Works are carried out for JSC "NK Rosneft" |
||
Full control assembly | 201? | ">Assembly and welding of steel constructions for 3 bridge cranes, width – 46 m, capacity – 25 tn., 80 tn., 80 tn. | ||
Repair of concrete slipway deck. Leaks elimination (45 sq. m.). Installation of ferroconcrete permeable and watertight bulkheads. Hydro jetting, using high-pressure machine. Painting, with 5-year anti corrosion warranty | 201? | >Concrete base floating deck servicing | ||
Crane rail installation on ship yard teritory; welding and assembling works. | 201? | Installation of Crain railway tracks. Crain capacity: move vessels weighing up to 2500 tn. | ||
Construction of a food industry plant. Materials: stainless steel; black steel, Cr-Mo alloys. Scope of works: assembly and welding of piping systems. | Netherlands
201? |
Cofely project
Performed in cooperation with New Energy Services. |
||
Performed in cooperation with New Energy Services.
Maintenance and repair work on polymer production facility. Materials: stainless steel; black steel, Cr-Mo alloys. Scope of works: assembly of piping systems. |
Netherlands
201? |
Emmtec | ||
Construction of pipe layer vessel Pieter Schielte (final stage). Assembly of heavy steel constructions. | Netherlands
201? |
Allseas Construction, Pieter Schielte project
Performed in cooperation with Sifleks Techservise. |
||
Piping construction for new built vessels.
1. Production and installation different diameters of pipes (DN8 - DN600) of different systems: fresh water; fuel, oil supply; waste and sludge; heating and steam; lube and hydraulic. 2. All pipe systems pressure tested. 3. All pipe systems marked with signs. |
Norway
201? |
Kleven Verft Ulsteinvik
Performed in cooperation with Baltic Energy Services |